Press release
… 1.777km steel profiles are produced at Frisomat every year? This is the same as the distance between Oslo and Paris.
… A 1.200-m² building has just 3,400 bolts.
… Our profiles are able to bear up to 75 times their own weight.
… A 1.000m² building weighs just 27t. That’s 20% less than the equivalent in hot-rolled steel.
… 19 innovations will be launched at Frisomat in 2014.
… 14,000 tonnes of steel are processed at Frisomat every year.
… A steel profile is produced at the rate of 6 m/min.
… Three Master’s students from the Catholic University of Leuven prepare their thesis at Frisomat every year.
… In 2013, Frisomat built 450,000 m² worldwide.
… Our engineers spend 7,800 man hours on innovation every year.